Wooloowin
Double Story Extension to an existing Queenslander to create a games room on the lower level and a Master Suite with Bedroom, Ensuite and WIR on the upper levelProject Timeline
16 Weeks
Project Challenges
- Pitching of the new roof to match into the existing was quite a tedious process on this project. We have 2 different angles to work with so this was very time consuming, and there were plenty of checks and measures along the way to make sure their were no mistakes!Project Highlights
- Master Suite on Upper Level- Aluminium Louvred Windows
- Blending of Materials to make the extension appear like it has always been in place
Project Metrics
50m2 Ground Floor Games Room extension50m2 Upper Floor Master Suite Extension