Carseldine

Complete Renovation of the lower level including removing load bearing walls to create an open plan Kitchen, Dining, Living and Lounge Area.

Project Timeline

12 Weeks

Project Challenges

- Termite Damage was found upon strip out of the existing walls and ceilings, which we needed to replace
- Structural Work required to support the upper level of the house, while keeping a lovely flat ceiling to the lower level

Project Highlights

- Kitchen
- Tiled Floor
- Open Plan of lower level

Project Metrics

145m2 Lower Level Internal Renovation

view Carseldine gallery