Cannon Hill

Major Internal Renovation and Extension to a Post war home to completely transform this house into 3 Bedroom, Bathroom, Laundry, Open plan Kitchen, Dining, Living area going out onto rear deck

Project Timeline

20 Weeks

Project Challenges

- Removing all asbestos from the existing house including roof, walls and ceilings
- Replacing the existing stumps that required replacement
- Working with the existing floor & frame structure that required some much needed love and attention!

Project Highlights

- Open Plan Kitchen, Dining and Living area going out onto the back deck
- Bathroom, Laundry

Project Metrics

Existing House 71m2
House Extension 45m2
Deck Extension 15m2