Major Internal Renovation and Extension to a Post war home to completely transform this house into 3 Bedroom, Bathroom, Laundry, Open plan Kitchen, Dining, Living area going out onto rear deck
Project Timeline
20 Weeks
Project Challenges
- Removing all asbestos from the existing house including roof, walls and ceilings
- Replacing the existing stumps that required replacement
- Working with the existing floor & frame structure that required some much needed love and attention!
Project Highlights
- Open Plan Kitchen, Dining and Living area going out onto the back deck
- Bathroom, Laundry
Project Metrics
Existing House 71m2
House Extension 45m2
Deck Extension 15m2