Project Challenges
The ground level outside was level with the internal concrete slab creating a potential water ingress issue. We installed a concrete nib and waterproofed over the top including the whole lower level to ensure we created a detail to prevent ingress.
Project Metrics
50m2 of Lower Level
30m2 of Entertaining Area
New Timber Windows & Doors
New Tiled Floor to lower level and entertaining area.